I've been handling energy procurement and facilities projects for commercial properties for nine years — fourteen buildings, roughly 2.1 million square feet of mixed industrial and office space. I've personally made (and documented) six significant mistakes on solar, storage, and EV charging projects, totaling about $41,000 in wasted budget. Now I keep the pre-signature checklist our team uses before anything goes to the CFO.

This is the story of one of those mistakes, plus the four things I learned investigating it. If you searched "is Vivint Solar still in business" and landed here, the answer is in the fourth section. If you searched "level 3 ev charger at home," skip to the sixth. I won't be offended.

September 2019: The Quote Nobody Wanted to Read

The CFO walked into my office on a Tuesday with a printed email and dropped it on the desk.

"Get me three solar quotes before the November board meeting. Roofs are empty, rates keep climbing, someone's going to ask why we're not doing this."

Fair enough. We had two flat roofs totaling about 48,000 square feet of usable area, a 2016 structural report that said the deck could handle roughly 4 pounds per square foot of added dead load, and a blended electricity cost that had crept up four consecutive years. I sent out a request for proposals to five installers. Three responded. Vivint Solar was one of them.

Their proposal was a 212 kW rooftop array split across both buildings, delivered as a 20-year power purchase agreement with a 2.9% annual escalator. Not the cheapest per kilowatt-hour of the three. The most complete on the roof warranty language, which mattered because our membrane warranty had eight years left on it and I didn't want to be the guy who voided it.

We signed the week before Thanksgiving.

The Clause I Initialed Without Thinking

Here's where I want to be precise, because I've told this story badly before at conferences.

Page 14, section 11.3 — or 11.4, I'd have to pull the binder to confirm, but it's in that neighborhood — said something like: "Lessor may assign this Agreement to any affiliate or successor entity without Lessee's consent, provided the successor assumes all obligations hereunder."

I read it. I initialed it. I didn't think about it, because it's boilerplate in every PPA I've ever reviewed. Every installer has that clause. It exists so the counterparty can sell the portfolio to a fund without chasing 400 customers for signatures.

The clause was fine. What I got wrong was the operational assumption underneath it: I assumed the company name on the contract would be the company I'd be calling for twenty years. Those are two different things, and only one of them is guaranteed.

October 2020: The Name on the Door Changed

In July 2020, Sunrun announced it was acquiring Vivint Solar in an all-stock deal — around $3.2 billion, as publicly reported at the time. The transaction closed on October 1, 2020.

I found out from a colleague forwarding me a news article, which is not how you want to learn about a counterparty change on a 20-year agreement. A week later, I tried to email the project coordinator who had handled our commissioning walkthrough. The address bounced.

What actually happened was less dramatic than what I feared for about 48 hours.

So — is Vivint Solar still in business?

Short answer: not as a standalone operating company. The brand was folded in, the sales and installation arm was absorbed, and the customer base moved under the Sunrun umbrella. If you're looking for a Vivint Solar sales phone number in 2025, you're going to find a redirect.

Long answer, and the one that matters for anyone holding a paper contract: the obligations didn't disappear, they transferred. Our PPA survived intact — same rate, same escalator, same term end date in 2039. Production kept flowing. Monitoring moved to a new portal, which took me about three weeks to get access to because I'd registered the original account under a deactivated email address. That's a me problem, not a them problem, but it's a cautionary tale worth two minutes of your time: register every energy account under a shared, monitored inbox, not your personal one.

Sunrun is a large, publicly traded national installer. The scale is real. What changed for me was procedural — new service portal, new ticket system, new escalation path — not contractual. I'd rather have known in advance, but my terms held.

Vivint Solar BBB: What That Search Actually Gets You

I spent a Saturday morning on this in early 2021, and again in January 2025 because I wanted to write about it accurately.

What you'll find: the Vivint Solar Better Business Bureau listing largely routes to the parent company now, which is the predictable outcome of a 2020 merger. I'm deliberately not going to quote a complaint count or a star rating here, because those numbers move monthly and a stale figure in an article is worse than no figure at all. Go look at it yourself and check the date on the page.

What I'd actually tell you to look at instead, if you're vetting an installer:

  • Response rate and resolution pattern, not the star average. A company with 400 complaints and a 95% response rate is a different animal than one with 90 complaints and silence.
  • State contractor license lookup. In California that's the CSLB; every state has an equivalent. Verify the license is active and check for disciplinary actions. This takes four minutes and tells you more than any review aggregator.
  • Permit history at the local AHJ. Call the building department. Ask how many permits this contractor has pulled in the last 24 months and how many failed first inspection. Building departments are public records and they answer the phone.

A BBB rating is a signal about complaint handling. It is not a credit rating, a quality rating, or a guarantee. I leaned on it too hard in 2019 and got lucky rather than smart.

February 2021: The Level 3 Charger That Couldn't Exist

Different building, different problem. Our VP of operations asked me to price out EV charging for four executive parking spots and said — I wrote this down — "get the fast ones, like the ones at the highway station."

Those are Level 3 chargers. DC fast charging. And here's what I got wrong before I understood the terminology: I requested a quote before I confirmed our electrical service capacity, because I assumed a parking lot charger was a parking lot charger.

Why "level 3 ev charger at home" is mostly a search-term problem

Let me lay out the levels, because the internet is genuinely confusing on this:

  • Level 1 — 120V standard outlet, about 1.2–1.4 kW. Adds roughly 3–5 miles of range per hour. Not a real solution for daily driving.
  • Level 2 — 208–240V, typically 7.2–11.5 kW for residential. Adds 20–30 miles of range per hour. This is your home charger, full stop.
  • Level 3 / DCFC — 400V+ DC, 50 kW to 350 kW. Requires three-phase commercial service, a transformer upgrade in most cases, and utility coordination that runs into months.

You cannot install a Level 3 charger at a single-family house in any practical sense. There are a handful of residential DCFC pilots and boutique products floating around, but they require service capacity most homes don't have and cost more than the car's first three years of fuel savings. I'm not going to tell you it's physically impossible, because someone will email me a link. I'll say this instead: if a quote you received promises a "Level 3 home charger," the word you're looking for is Level 2, and the quote was written by someone who doesn't know the terminology or is counting on you not knowing it.

The actual mistake I made: I paid $2,400 for an engineering feasibility study on a DCFC installation before anyone asked me what service we had. Answer: 208V three-phase, 400 amps, already at 71% of capacity. The study came back with a handshake and a "not on this service, not on this budget." That's $2,400 I could have avoided with a five-minute conversation with our electrical contractor.

For the homes of those four executives, we ended up specifying 48-amp Level 2 units on dedicated 60-amp circuits. That's the realistic ceiling for residential.

Q3 2022: Where Our Storage Numbers Went Sideways

This one still stings, so I'll be brief. We added 215 kWh of commercial battery storage across two cabinets, UL 9540 listed, primarily for demand-charge reduction with a secondary backup function for a server room.

Here's the causation reversal that cost us real money: I assumed the battery would deliver savings because demand charges were high. The reality is that savings come from a specific relationship between your load shape and your rate tariff — and high demand charges only create the opportunity, not the outcome.

Between the initial feasibility model and the commissioning date, our facilities team completed a chiller retrofit that shaved 90 kW off our summer peak. We didn't re-run the model. The storage system was sized against a peak that no longer existed, and the demand-charge savings came in at roughly 40% of the original projection. That's the $21,000 item in my tally.

What I'd do differently: sequence your efficiency retrofits before you size storage, not after. Energy storage systems for renewable energy are only as good as the interval data you feed them, and 12 months of interval data from a pre-retrofit building is a snapshot of a building that doesn't exist anymore.

For anyone sizing this now — as of early 2025, standalone storage can qualify for the federal investment tax credit at 30% base, with adders for domestic content and energy communities. Prevailing wage and apprenticeship rules apply if you want the full rate. Confirm all of that with your tax advisor and the current IRS guidance, not with a blog post, including this one.

March 2023: What Is a Portable Solar Generator, Really?

We had a 26-hour outage at a satellite yard in March 2023. I bought two portable solar generators for the site trailer and the security camera bank, plus folding panels. Total: $1,900 for the units, $600 for panels.

A portable solar generator is not a generator. It's a battery-in-an-inverter, usually 500 Wh to 3 kWh, with an MPPT solar charge controller, AC outlets, USB, and a handle. You charge it from a wall outlet, a car, or folding panels. Look for UL 2743 on the label — that's the portable power pack standard, and a lot of cheap imports skip it.

Where I went wrong was ignoring the gap between the marketing number on the box and the usable number at the plug. A 1,500 Wh unit with a 90% depth of discharge gives you about 1,350 Wh of usable energy. If you pull it through an inverter at 85% efficiency, you're at roughly 1,150 Wh — and that's before panel losses. A 200W folding panel in January at 40° latitude, tilted wrong and dusted with road salt, produced around 480 Wh on a good day in my logs. Not 200W × 6 sun hours. About 480 Wh.

What it's genuinely good for: keeping a modem, a laptop, and four cameras alive during an outage. What it's not: backing up a building, running a well pump, or replacing a standby generator.

What I Actually Changed

Two years ago I moved all our energy project tracking out of email threads and into a shared tracker with automated interval-data pulls. Our review cycle for a new site went from five weeks to nine days. That's the efficiency argument, and I'll make it plainly: fewer human handoffs means fewer places for a stale number to survive into a final model. The chiller retrofit fiasco was a handoff problem, not an analysis problem.

But I'll be honest about the limit. For sites with weird service configurations or mixed-use tariffs, I still walk the building with our electrical contractor and a clipboard. The automation doesn't know what the chiller retrofit did. A guy in a hard hat does.

If I could redo the 2019 decision, I'd still have signed. I'd have asked three different questions first, though. Looking back, that's the whole lesson.

My pre-signature list now:

  • Who is the legal counterparty, and who can they assign to? (Not to negotiate it out — just to know.)
  • Which email address owns this account, and who has the password when I leave?
  • What is our service capacity, in amps and volts, before I request a single quote?
  • Has anything about this building's load profile changed since the interval data was pulled?

Four questions. About twenty minutes of work. The version of me from six years ago would have saved $41,000.